Electrical System Modernization — 80,000 sq ft Warehouse
The Challenge
An aging 400A service with no panel directory, multiple double-tapped breakers, and a history of unexplained outages was creating operational risk for a distribution facility.
Our Diagnosis
Full panel audit and thermographic scan revealed three overloaded circuits, two failing breakers, and a main lug connection with significant oxidation.
The Result
Panel was fully documented, overloaded circuits were corrected, failing components replaced, and a preventive maintenance schedule was established. Zero unplanned outages in the 12 months following.